KEY
Contracts
approved and initiated — blue
Contracts
or NOPA under development - red
Activity
not initiated - green
RENEWABLE ENERGY ($10.5 million)
<> Collaborative Agreements or Sole Source Contracts ($2.7 million)
Making Renewables More Affordable
Byproduct
development: lignin testing ($500k): (Q2)
Lower cost
utility-scale wind turbines: Phase 2 ($1 million) (Q3)
Cross Cutting Analytical Tools
Strategic
Value Analysis: ($300k) (Q2)
Market Assessments:
($360k) (Q2)
Quantification
of Benefits from Renewable Electricity: ($60k) (Q2)
<> COMPETITIVE SOLICITATIONS ($7.2 million)
Small Modular
Biomass CNS ($1.3 million) (Q2)
Making Renewables More Affordable
($2.8 million)
Reducing
capital and/or O&M costs, developing value added products, capturing
non-energy benefits, etc. (Q3)
Increasing Reliability and Dispatchability
of Renewables ($1.8 million)
Co-firing,
hybrid systems, lower cost storage, etc. (Q4)
Increasing Environmental Benefits
($1.3 million)
Increasing
use of waste fuels, reduced air, water or land impacts, etc. (Q4)
<> MEMBERSHIPS ($581k)
EPRI (1999)
Renewables Target ($331k) (Q1)
Wind Forecasting Model: Tailored Collaborative ($250k) (Q2)
ENVIR. PREF. ADV. GENERATION (EPAG) ($9.92 Million)
<> INTERGOV/TARGETED SOLE SOURCE ($3.7 million)
Advanced Turbine Generators
MT Demo&Testing ($500k)
Development of Ultra-Low Nox Surface Stabilized Combustor ($1,000k)
Fuel Cells (FC)
Residential-Scale FC Testing & Evaluation ($500k)
Dynamic Models for FC Systems ($400k)
FC Performance Analysis Tools ($300k)
Cross-Cutting and Other EPAG Technologies
Unanticipated opportunities ($1,000k)
<> COMPETITIVE SOLICITATIONS ($5.5 million)
Advanced Turbine Generators
Targeted MT Development ($2,000k)
Fuel Cells
Targeted FC Development ($2,000k)
Total FC Power Plant System Performance ($300k)
Cross-Cutting and Other EPAG Technologies
Power Conditioner Unit ($200k)+
Innovative projects grant ($1,000k)
<> MEMBEERSHIPS ($0.72million)
Cross-Cutting
and Other EPAG Technologies
EPRI ($155k)*
IC Engine For DG
FC DG Systems
GRI Advanced SOFC ($68k)*
GRI Reciprocating Engine Collaborative ($500k)
--------------
*These projects are being co-funded
with at least one other PIER program area.
*The estimated cost in this table
is only the EPAG portion of the total cost.
+ Only successful EPAG projects
selected competitively in the Small Grants Program will be eligible.
BUILDINGS PROGRAM AREA ($10M)
<> INTERGOV/TARGETED SOLE SOURCE ($1.0 - 1.5M)
ASHRAE (Sole
Source)
Staff developing
draft contract.
ARTI — HVAC
(Sole Source)
Staff reviewing
collaboration opportunities
DOE — Building
America (Intergovernmental Agreement)
Staff developing
draft contract and continuing discussions with DOE to develop EE residential
systems designs in CA inland regions
<> COMPETITIVE SOLICITATIONS ($8M)
Programmatic
Solicitation ($6M)
Responds
Across Technologies to Issues, Goals, Objectives
RFP release
7/99; Proposals due 9/99; NOPA anticipated 11/99
{ Awards were announced Nov 8 --
http://www.energy.ca.gov/contracts/1999-11-08_notice_awards.html
http://www.energy.ca.gov/contracts/1999-11-08_PIER_AWARD.PDF
}
Targeted Solicitation
($2M)
Planning
(including public focus group meetings) Begin 1/00
Anticipated
solicitation 6/00
<> MEMBERSHIPS ($.35M)
EPRI
1 TC ($126k)
and 1 Target ($40k) approved 7/99
Lighting Research
Center (LRC) ($50k)
Staff developing
draft contract
Gas Research
Institute (GRI)
1 Target
approved 7/99 ($77k)
Center for
the Built Environment (CBE) ($30k)
Membership
approved 8/99
INDUSTRIAL/AG/WATER PROGRAM ($15.3M)
<> INTERGOV/TARGETED SOLE SOURCE Total $ 5.8M
UC DAVIS
Ozone for
replacing Methyl Bromide, irrigation scheduling, dairy wastewater treatment
$ 1.8 M
CAL POLY
Optimizing
California agricultural water delivery $ 1.5 M
CIEE/LBL $
0.5 M
Hi-Tech Industry
Clean-room Initiative
WATER-ENERGY
R&D $ 2.0 M
Water Energy
Research
<> COMPETITIVE SOLICITATIONS Total $ 7.9 M
MUNICIPAL
WATER SUPPLY AND INDUSTRIAL WASTEWATER TREATMENT $ 1.0 M
RFP under
development
FOOD PROCESSING
INDUSTRY $ 2.0 M
Industry
analysis completed
RFP under
development
CALIFORNIA
INDUSTRY EFFICIENCY RD&D $ 2.5 M
RFP under
development
CROSSCUTTING TECHNOLOGIES FOR HIGH IMPACT BUSINESS SECTORS $ 1.5 M
<> MEMBERSHIPS Total $1.6M
ELECTRIC POWER RESEARCH INSTITUTE
Eight Targets
($ 1.4 M/yr)
TC Projects
($ 0.5 M/yr)
Tech Transfer
GAS RESEARCH
INSTITUTE
Two Programs
(0.2 M)
Tech Transfer
ENVIRONMENTAL PROGRAM AREA ($10.6M)
<> INTERGOV/TARGETED SOLE SOURCE ($3.5M)
Central California
Ozone Study ($3M)
approved
6/99, work statement under development
Transmission
Line Right of Way($300k)
Staff reviewing
collaborative opportunities
Developing
Greenhouse Gas Emissions Inventory Methodologies ($200k)
Staff reviewing
collaborative opportunities
<> COMPETITIVE SOLICITATIONS ($5.5M)
Alternative
cooling water strategies ($2M)
Targeted solicitation planning (including public focus group meetings)
Begin 1/00
Anticipated solicitation 6/00
Evaluate,
select and fund promising electro-technologies ($3M)
Targeted solicitation planning (including public focus group meetings)
Begin 3/00
Anticipated solicitation 9/00
Innovative
Concept Support — Phase I and II ($500k)
Staff developing plan in cooperation with grant manager
<> MEMBERSHIPS ($1.6M)
Decrease impacts
of power plant water intakes on fish populations ($357k) approved 7/99
Develop cumulative
impact models for assessing the impacts of hydro-facilities on watersheds
($179k) approved 7/99
Improve water
management practices in power plants ($138k) approved 7/99
Modeling
— integrated analysis of pollution discharges to air, water, and soil at
energy facilities ($690k) approved 7/99
Tailored
Collaborative on Dry Cooling Technology ($200k)
Staff developing draft contract
STRATEGIC SCIENCE AND TECHNOLOGY
($11.6 Million)
<> Targeted and Negotiated ($1.8 million)
Interconnection Standards ($300K)
Interconnection Hardware ($400k)
Power Quality ($600 K)
Storage ($600 k)
<> Programmatic ($5.2 million)
System reliability ($2.4 million/yr for 3 years)
Seismic Studies ($1.8 million/yr for three years)
Distributed
Energy Collaborative ($1 million/yr for three years)
<> MEMBERSHIPS ( $2.6 Million)
EPRI
GRI
Special Opportunity
CINS ($1 million/yr for three years)
Unplanned